Quality Control Plan
Date Originated:
■Prototype RPre-Launch □Production
Control Plan No.:
Part Name/Description: Hydraulic Rubber Hose Assembly
Customer Approval Date:
Supplier Approval Date:
Supplier:Hangzhou Haikuo
Approved by:
Prepared by:
Item
Operation/Description
Machine, Device, Tools
Characteristic
Methods
Reaction Plan
Process
Product/process
Evaluation/Measurement
sample
Control Method
Specification/Tolerance
size
Freq.
1
Incoming Material Inspction
Appearance
No damage, pollution, moisture
Visual
once
per lot
Inspector sampling and checking the warranty book
Reject,segregate and notify the purchasing department
composition
Subject to the warranty
2
Rubber raw material storage
Pallet/forklift
Identification
Clarity
100%
Warehouse clerk self-inspection
Rework,adjustment
environment
Ventilation, drying, avoid direct sunlight
3
Ingredient
Electronic scales
Recipe sheet
control by computer
continuous
Computer error prevention system
Adjust,inform the production department
Weighing
Rubber refining plan
Digital display, voice prompts
4
Rubber mixing
Mixing machine
Temperature
specification
Computer program setting
Weight
Time
making rubber sheet
rubber sheet making machine
Times
Process work instructions
worker self-inspection
gap
Dial
5
Rubber sheet inspection
Physical properties
Hardness
Hardness Tester
Inspector spot-check
Tensile Strength
Rubber tensile Machine
Elongation rate
6
inner tube extrusion
Extrusion Machine
No damage, oil, bubble
Rework, adjust,inform the production department
5/8" (φ15.8mm ±0.5mm)
caliper
7
Steel Wire braid
Brading Machine
No braid missing,
8
outer tube extrusion
φ23.8 mm ±0.5mm
9
Printing
Print machine
clear and error-free
10
rap the cloth
Cloth wrapping machine
11
coil hose
Coil rack
keep clean
12
vulcanize
vulcanizer
Standard request
13
Take off wrapped cloth
Unwrapping machine
14
core-pulling
Water press machine
High pressure
Core- pilling out
15
Pressure test
Pressure machine
2 times than W.P
No damage, no leakage
16
cutting
cutting machine
Edge smooth
Rework, adjust
≥8' (2.44m)
tapeline
17
crimping connectors
crimping machine
no gap, crack, leaking
crimping standard
18
Final Inspection
Finished product inspection work instructions
Caliper/Tapeline
Rejection, segregation, notification of quality department
19
Burst pressure
4 times than B.P
20
Packing
packing machine
packing qty
product packing list
packing worker self-inspection
Isolation, rework
method
If you can envision it, then we can build it, tell us more about your project, our service team will get back to you within 24 hours normally !